Wednesday, March 4, 2009

Distances and Altitudes in Khyber Pass

Considering Peshawar Cant as 0km, following table gives a view of distances and altitude of different landmarks along Khyber Pass Railway.
Station Name
Distance km
Altitude in feet
Peshawar Cantt
0
1048
Jamrud
18
1496
Bagiari

1837
Medanak (1st Reversing Station)

2086
Chagai (2nd Reversing Station)
34
2270
Shahgai

2265
Kata Kushta

2799
Zintara

3114
Sultan Khel

3293
Landi Kotal
52
3494
Tora Tigga (3rd Reversing Station)

2876
Landi Khana (4th Reversing Station)
60
2622

Catch Sidings

Besides reversing stations, track at numerous places is also provided with the runway train catch sidings. One such catch siding is shown in the photo on the right (above).
The Khyber Railways is the last of the great railway constructions undertaken on the frontier during the British Raj. From 1947 onwards, Pakistan Railway continued a weekly passenger service through Khyber Pass. The service ran free of charge simply as a gesture to prove to the fiercely independent tribesmen that the line, in-spite of them, was open and the Pakistan Government was the boss. The regular service in Khyber Pass stopped in 1982 due to the lack of commercial patronage.
Due to axle load limitations, diesel engines cannot run on this track. Therefore Khyber Pass railway to date is served by steam locomotion only.

Landi Kotal to Landi Khana

On April 3, 1926 another portion of 8 km track is opened up to Landi Khana which fall just 3 km short of the actual frontier post of Torkham. The photo in sepia to the left is from April 27, 1932. It shows a tunnel on Khyber Pass railway alongwith (now highway) N5 which runs alongside the track. On December 15, 1932 the Landi Kotal to Landi Khana section of railway was closed down at the insistence of Afghan Government.

Across Peshawar Airport. After

After crossing Bara Gate the train slows down and ultimately comes to a full stop. In front of the locomotive lies the 9000 ft long runway of Peshawar International Airport. The train now waits for clearance from the airport control tower before it could move. Sometimes the clearence comes over the phone and sometimes the train crew has to personally walk to the tower and get clearence while enjoying cup of tea with the tower staff. Peshawar is the only international airport in the world where a rail track crosses the main runway. The small photo above is the satellite image of Peshawar airport’s main runway. The diagonal path crossing the runway is the Peshawar - Landi Kotal rail track. After clearance is received from the control tower, the train chugs forward.

Departing Peshawar.pak railway

It is 8:00 a.m. on a sunny Sunday at Peshawar cantonment. The Steam locomotive number 2216, which was built in 1916 by Kitson and Company of Leeds, UK is all set to start on yet another journey. The driver and fireman give one final inspection to the engine vitals and with a long whistle the number 2216 coupled to a tourist train pulls out of the station. Today the destination is Landi Kotal via Khyber Pass

Awais Mughal

Curtain Raiser. On August 23, 2006, ATP had a post on Bolan Pass, on November 2, 2006 another post on Chappar Rift and on December 18, 2006 yet another post on Khojak Tunnel. In the following we will discuss another famous pass railway of Pakistan i.e. The Khyber Pass Railway. Before we start on our journey, a word about the photograph below. It shows the arrival of weekly Sunday passenger at Landi Kotal in 1975. It is being pulled and pushed by two steam locomotives which signify the effort required in bringing this train from Peshawar, up the Khyber Pass to Landi Kotal

Pakistan Railways

This article is about the rail company in Pakistan. For technical details and operations see: 'Transport in Pakistan'.Pakistan RailwaysLogo Reporting marks PRLocale PakistanDates of operation 1947–presentTrack gauge 1,676 mm (5 ft 6 in) and 1,000 mm (3 ft 3⅜ in)Headquarters Lahore, PunjabWebsite www.pakrail.comPakistan Railways is the state-owned railway company of Pakistan. It is a large organization under the administration of the Pakistani Government's Ministry of Railways. Pakistan Railways provides an important mode of transportation in the farthest corners of the country and brings them closer for business, sightseeing, pilgrimage and education. It has been a great integrating force and forms the life line of the country by catering to its needs for large scale movement of people and freight. The current chairman is Mr. Shakil Durrani.

history of pakistan railway

Pakistan Railways provides an important mode of Transportation in the farthest corners of the country and brings them closer for Business, sight seeing, pilgrimage and education. It has been a great integrating force and forms the life line of the country by catering to its needs for large scale movement of people and freight.The possibility of Karachi as a sea port was first noticed in the mid of 19th century and Sir Henry Edward Frere who was appointed Commissioner of Sind after its annexation with Bombay in 1847 sought permission from Lord Dalhousie to begin survey of sea port. He also initiated the survey for Railway line in 1858 . It was proposed that a railway line from Karachi City to Kotri, steam navigation up the Indus /Chenab upto Multan and from there an other railway to Lahore and beyond be constructed.It was on 13th May,1861 that first railway line was opened for public traffic between Karachi City and Kotri, the distance of 105 miles. The line between Karachi City and Keamari was opened on 16.6.1889.By 1897 the line from Keamari to Kotri was doubled.The railway line from Peshawar to Karachi closely follows Alexander’s line of march through the Hindu Kush to the sea. Different sections on existing main line from Peshawar to Lahore and Multan and branch lines were constructed in the last quarter of 19th century and early years of 20th century.The 4 sections i.e.Scinde railways, Indian Flotilla company Punjab railway and Delhi railways working in a single company were later on amalgamated into Scinde, Punjab & Delhi railways company and was purchased by the Secretary of State for India in 1885 and in January, 1886 it was named North Western State Railways which was later on renamed as North Western Railways.At the time of partition, North Western Railway’s 1847 route mile was transferred to India leaving route miles 5048 to Pakistan. In 1954 The railway line was extended to Mardan and Charsada section and in 1956 Jacababad-Kashmore 2’-6’’ line was converted into broad gauge. Kot Adu-Kashmore line was constructed between 1969 to 1973 providing an alternate route from Karachi to up country.

Post-Independence

At the time of independence, 1,947 route miles (3,133 km) of North Western Railways were transferred to India, leaving 5,048 route miles (8,122 km) to Pakistan. In 1954, the railway line was extended to Mardan and Charsada, and in 1956 the Jacobabad-Kashmore 2 ft 6 in (762 mm) gauge line was converted into broad gauge. The Kot Adu-Kashmore line was constructed between 1969 and 1973 providing an alternative route from Karachi up the country.

British Era

The possibility of Karachi as a sea port was first noticed in the middle of 19th century. Sir Henry Edward Frere was appointed Commissioner of Sindh after its annexation with Bombay in 1847 and sought permission from Lord Dalhousie to begin a survey for a sea port. He also initiated the survey for a Railway line in 1858. It was proposed that a railway line from Karachi City to Kotri, steam navigation up the Indus and Chenab rivers up to Multan and from there another railway to Lahore and beyond be constructed.
It was on 13 May 1861 that first railway line was opened for public traffic between Karachi City and Kotri, a distance of 105 miles (169 km). The line between Karachi City and Kiamari was opened on 16 June 1889. During 1897 the line from Keamari to Kotri was doubled.
The railway line from Peshawar to Karachi closely follows Alexander’s line of march through the Hindu Kush mountains to the Arabian Sea. Different sections on the existing main line from Peshawar to Lahore and Multan and branch lines were constructed in the last quarter of 19th century and early years of 20th century.
The 4 sections, i.e., Scinde (Sindh) Railways, Indian Flotilla Company, Punjab Railway and Delhi Railways, working in a single company, were later on amalgamated into the Scinde, Punjab & Delhi Railways Company and purchased by the Secretary of State for India in 1885, and in January, 1886, it was named North Western State Railways, which was later on renamed as North Western Railway. In 1961, the Pakistani portion of the North Western Railway was renamed Pakistan Railways.

History of rail transport in Pakistan

Pakistan has a rich railway heritage spanning almost 200 years which it owes the British and which was also shared with what is now India and Bangladesh up until 1947, however this article deals only with the history of rail transport in what is now present day Pakistan and which was then the north-western part of the British India. It was in 1847 when the first railway was imagined but it was not until 1861 when it came into existence in the form of the railway built from Karachi to Kotri. Pakistan has stayed true to this rich heritage because since rail transport is possibly the most popular mode of non-independent transport in Pakistan